The Acute Services
Building was commenced in 2001 for Fletcher Construction. The
project comprised of nearly 4000 tonnes of structural steel
and was unique in the respect that a large proportion of the
Fabricated Steel was supplied to site unpainted and subsequently
site treated to meet fire rating requirements.
The Project has been the subject of numerous case studies that have commented on the speed at which the structure was detailed, fabricated and erected.
The photograph was taken from a point close to the top of the Skytower.