Built for Hawkins Construction and the Forsyth Barr Trust, through 2009-2010, Approximately 3,500 tonnes of Complex Pipe Fabrication. Pipe sections up to 711mm diameter and up to 60mm in wall thickness were utilised. The project was fabricated to a high standard of accuracy and quality. All parts of the structure were trial assembled at our works prior to shipping to Dunedin, whereupon the structure was erected by our skilled site team. CNC technology was employed throughout the primary parts of the fabrication process.

 